PROJECT EXPERIENCES (COMPLETED)

 

No. Descriptions Period
1 Supply and Install CCTV system for Kuala Lumpur International Airport (KLIA) 2011
2 Supply and Install BMS System for Malaysian Nuclear Agency Bangi 2011
3 Testing & Commissioning Stage One for Temporary Signalling at Station Tasek, Kuala Kangsar, Taiping, Padang Besar, Prai Yard, Butterwoth, Bukit Mertajam 2011
4 Seremban to Sg. Gadut Electrified Double Tracking Project (SGEDT)  Phase 1 2011
5 Supply Labour For Northern Double Tracking Project Between Ipoh And Padang Besar 2012
6 Construction And Completion Of Construction Level Crossing (C.L.C) On Top Of 2T Track Line At ch127.694 2012
7 Manpower Supply Testing Team for Commissioning Rembau Station SGEDT Project Phase 2 2012
8 Relocation Of Cabin (SMO Room) For Temporary Signalling Works at Bukit Ketri Station 2012
9 Electrified Double Track Project (EDT) between Ipoh and Padang Besar For Stagework And Temporary Signalling at Simpang Empat & Sg Petani Station 2012
10 Extension of  Buffer Stop And Rail Jointing at Sri Petaling Station 2012
11 Manpower Supply Cable Laying Works For ATP Cable at SGEDT Project Phase 2 2012
12 Manpower Supply Cable Laying Works For Communication Cable at SGEDT Project Phase 2 2012
13 Manpower Supply Prewiring Team for SGEDT Project Phase 2 2012
14 33KV Cable Relocation Works  at Subang Depot for Kelana Jaya (KLJ) Line Extension Project 2012
TOUCHTRONICS RAIL AND SERVICES SDN BHD           YEAR – 2013

­

PROJECT EXPERIENCES (COMPLETED)

No. Descriptions Period
15 Design, Supply and Installation of UTX, GI Pipe, HDPE Pipe, Excavation of trench and back filling after cable laying on South side (JB) and east side (ECL) of Gemas yard of SGEDT Project 2013
16 Cable Laying and Installation Works  for ACDB, RTU and MI at SGEDT Project 2013
17 Design, Supply and Install Temporary And Staging Works For Signalling/Communication Facilities And System At Tasek Gelugor Station TS03 &TS04 2012
18 Sg.Gadut – Gemas Electrified Double Tracking Project (SGEDT) Phase 2 Signalling Works 2012
19 Manpower Supply For Cable And Wayside Equipment Installation At EDT Project Between Ipoh And Padang Besar 2012
20 Installation of Automatic Train Protection (ATP) System for SGEDT Project Phase 2 2012
21 Installation Works for Passenger Information System(PIS) and Closed Circuit Television (CCTV) System for KTMB Station 2012
22 Manpower Supply Signalling & ATP Team For IPBDT Project 2012
23 Service for Relocation of Existing KTMB Materials at Kajang Depot for KVMRT V8 Project 2013
24 Mass Rapid Transit Lembah Kelang Jajaran Sg.Buloh – Kajang. Package V8-Sub-contract Relocation of Communication Tower, Signalling and Fiberail Cables 2013
25 Mass Rapid Transit Lembah Kelang Jajaran Sg.Buloh – Kajang. Package V8-Sub-contract Construction and Completion of Drop Tube Under The Permanent Building for 25kv Overhead Catenary (OCS) Mast Relocation Works 2013
26 Mass Rapid Transit Lembah Kelang Jajaran Sg.Buloh – Kajang. Package V8-Sub-contract Design and Build For 25kv Overhead Catenary (OCS) Masts Relocation Works 2013
PROJECT EXPERIENCES (COMPLETED)

No. Descriptions Period
27 Track Monitoring Works at Subang Jaya KTMB Station For LRT Kelana Jaya Line Extension Project: The Construction and Completion of Facilities Works (Package A) 2013
28 Service for Track Monitoring and Emergency Response Team for KVMRT V8 Project at KTMB Kajang Station 2013
29 Track Monitoring Works and Emergency Response Team  at KTMB Station Sg Buloh for KVMRT-S1 Project 2013
30 Mass Rapid Transit Lembah Kelang Jajaran Sg.Buloh – Kajang. Package V8-Sub-contract Construction And Completion of Concrete Hardstanding including Materials Recovery 2013
31 Mass Rapid Transit Lembah Kelang Jajaran Sg.Buloh – Kajang. Package V8-Sub-contract Construction And Completion Of Covered Walkway 2013
32 Mass Rapid Transit Lembah Kelang Jajaran Sg.Buloh – Kajang. Package S1-Sub-contract Design And Build for Relocation of KTMB Facilities System at Sg.Buloh Station 2013
33 Mass Rapid Transit Lembah Kelang Jajaran Sg.Buloh – Kajang. Package V8-Sub-contract Construction And Completion of Temporary BridgeFor Infrastructure,Track And System Relocation Works 2014
34 Mass Rapid Transit Lembah Kelang Jajaran Sg.Buloh – Kajang. Package V8-Sub-contract Construction And Completion of Track Works 2014
35 Mass Rapid Transit Lembah Kelang Jajaran Sg.Buloh – Kajang. Package V8-Sub-contract Construction and Completion of Piling Works For Workshop And Temporary Pedestrian Bridge 2014
36 Mass Rapid Transit Lembah Kelang Jajaran Sg.Buloh – Kajang. Package V8-Sub-contract Construction and Completion of Workshop Works at Kajang Station for KTMB 2014
PROJECT EXPERIENCES (COMPLETED)

No. Descriptions Period
37 Mass Rapid Transit Lembah Kelang Jajaran Sg.Buloh – Kajang. Package V8-Sub-contract Materials Supply for Construction and Completion of Track Works For Infrastructure, Track and System Relocation Works 2014
38 Provision of Signalling Works For Anak Bukit and Arau at Ipoh Padang Besar Electrified Double Track Project 2014
39 Provision of Signalling Works For Gurun  at Ipoh Padang Besar Electrified Double Track Project 2014
40 Project Relocation Of KTMB Diesel Tank From KL Sentral Depoh to KL Old Station – Relocation Of Fiber Optic Cable And Power Cable 2014
41 Refurbishment Works At KTMB Subang Jaya Station Master Room For Relocation Of Data And PABX Cable to Temporary KTMB Cabin 2014
42 To manual trenching, lay, compacting and testing of new ATP cable between Relay Room Station Pelabuhan Klang Selatan Until DB11 (Pelabuhan Klang Selatan – Jln Kastam) 2014
43 To manual trenching, lay, compacting and testing / Rectification of new signalling 28,21,14,7,4,2 Pairs Signalling And 4C x 2.5mm Power Cable between SER/Relay room Station Pelabuhan Klang Selatan – Jln Kastam) 2014
44 Construction and completion of Metal Deck, Steel Platform and Cable Relocation works At KTMB Subang Jaya Station 2014
45 Design, Manufacture, Supply, Deliver And Install Of Permanent Protection For Existing KTMB Signalling Cable for the Kelana Jaya Line Extention Project (KLJ) 2014
46 Mass Rapid Transit Lembah Kelang Jajaran Sg.Buloh – Kajang. Package V8-Sub-contract Construction and Completion of Piling Works For KTMB Quarters 2015
PROJECT EXPERIENCES (COMPLETED)

No. Descriptions Period
47 Mass Rapid Transit Lembah Kelang Jajaran Sg.Buloh – Kajang. Package V8-Sub-contract Construction and Completion of Piling Works For RTM New Development Area : Guard House, Store, TNB Substation. Surau, Office And Semi D Quarters 2015
48 Mass Rapid Transit Lembah Kelang Jajaran Sg.Buloh – Kajang. Package V8-Sub-contract Construction and Completion TNB Civil And Structure Works At RTM Kajang 2015
49 Mass Rapid Transit Lembah Kelang Jajaran Sg.Buloh – Kajang. Package V8-Sub-contract Demolition Works Of Existing Pedestrian Bridge At Kajang Station 2015
50 Mass Rapid Transit Lembah Kelang Jajaran Sg.Buloh – Kajang. Package V8-Sub-contract Relocation Of One Existing Headspan Arrangement to New Portal Arrangement at M414.7917 And Associated Works 2015
51 Rectification Of Railway Tunnels, Track Rehabilation And Upgrading And Associated Works Between Kuala Krai And Kuala Lipis Station 2015
52 Service for Track Monitoring and Emergency Response Team For Project Relocation Of KTMB Diesel Tank From KL Sentral Depoh to KL Old Station 2015
53 Mass Rapid Transit Lembah Kelang Jajaran Sg.Buloh – Kajang. Package V8-Sub-contract Construction And Completion of Lubricant Store, Diesel Fuel System and Car-Motorbike Parking 2016
54 Mass Rapid Transit Lembah Kelang Jajaran Sg.Buloh – Kajang. Package V8-Sub-contract Construction And Completion of Fuelling Station 2016
PROJECT EXPERIENCES

No. Descriptions Period
55 MSPR9 Construction and Completion Of Viaduct Guideway And Other Associated Works From Taman Mesra to Kajang Station 2016
56 Supply and install Anti-Climb Fencing At KTMB Workshop Kajang 2016
 57 Construction and Completion of Water Reticulation Works At KTMB Workshop Kajang 2016
 58 Construction and Completion Fire Fighting System  At KTMB Workshop Kajang 2016
59 Duta Ulu Kelang Expressway (DUKE) Phase 2_ Relocation Works Of Overhead Catenary System (OCS) Mast KM 380.376D At Segambut KTMB Track 2016
60 Service for Track Monitoring and Emergency Response Team For Duta – Ulu Klang Expressway (DUKE) Phase 2 2017
61 Klang Valley Mass Rapid Transit (KVMRT) Lembah Klang Sg Buloh – Kajang; Package PASS. Construction and Completion of  Pasar Seni Paid Link And Other Associated Works Betweeen Existing Pasar Seni LRT Station and Kuala Lumpur KTM Station _ KTMB Related System Services 2017
62 Service for Track Monitoring and Emergency Response Team For  Cadangan Pembangunan Perdagangan Di atas lot 20922 Lebuhraya Perseketuan, Batu Tiga, Subang Jaya, Selangor 2017
63 Duta Ulu Kelang Expressway (DUKE) Phase 2, Section 1 Sri Damansara Link_Supply and install earthing / bonding works for steel structure at affected KTMB Track Area 2017
64 Mass Rapid Transit Lembah Kelang Jajaran Sg.Buloh – Kajang. Package S8-Sub-contract Upgrading & Refurbishment Works Of Existing KTMB’s Kajang Station 2017
65 Mass Rapid Transit Lembah Kelang Jajaran Sg.Buloh – Kajang. Package S1-Sub-contract Upgrading & Refurbishment Works Of Existing KTMB’s Sg Buloh Station 2017
66 Electrified Double Track Project Ipoh To Padang Besar – The Construction, completion, testing, commissioning, and maintenance the system works. (Package S15-S25)_ Modification Works For OCS Height Rectification & Affected Mast Replacement 2017